BALL JOINT – Remove & Replace – F250 Super Duty,F350 Super Duty,4WD w/Single Rear Wheels,Upper & Lower,Both Sides – [DOES NOT include alignment.]
CHECK BRAKES
CHECK CATS
SUSPENSION REVISION
TIE ROD &/OR END – Remove & Replace – F250 Super Duty,F350 Super Duty Each Additional – [Includes: Adjust toe-in only. NOTE: Deduct .4 if alignment is also performed. NOTE: Manufacturer recommends removal of Rack and Pinion Steering Gear when replacing In
TIE ROD &/OR END – Remove & Replace – F250 Super Duty,F350 Super Duty Inner or Outer – [Includes: Adjust toe-in only. NOTE: Deduct .4 if alignment is also performed. NOTE: Manufacturer recommends removal of Rack and Pinion Steering Gear when replacing Inn
Alan D. gave our service a 5 star review on 4/3/2021
2005 Ford Pickup CRM Mitchell1
2021-04-07T22:01:11+00:00
Flat Repair-Remove wheel and tire from vehicle; Remove tire from wheel; Patch tire; mount tire on wheel; Install wheel and tire on vehicle.
Lubricate and check chassis. Change oil and oil filter. Check air filter and breather filter. Check all fluid levels and tire pressures. Preform basic safety inspection. Road test vehicle.
Oil Disposal
Ricky G. gave our service a 5 star review on 3/30/2021
Check brake fluid for moisture and contamination. Inspect all hydraulic line and hoses. Inspect calipers and wheel cylinders. Inspect master cylinder and cap. Flush entire brake system including master cylinder, calipers, wheel cylinders until clean.
Four Wheel Alignment, checked steering and suspension parts, and adjusted camber, caster and toe in/out where applicable.
Lifetime Computer Wheel Balance
Lubricate and check chassis. Change oil and oil filter. Check air filter and breather filter. Check all fluid levels and tire pressures. Preform basic safety inspection. Road test vehicle.
Nitrogen Installation
Oil Disposal
SPARK PLUGS – Remove & Replace – 2.5L Eng All
Tire Disposal
Jane R. gave our service a 5 star review on 3/24/2021
GO TO PHASE 2 AFTER APPROVAL AFTER EACH PHASE A RETEST WILL BE NEEDED TO BE PERFORMED AND IF IT FAILS AN ESTIMATE WILL BE PROVIDED FOR THE NEXT PHASE
VARIABLE VALVE TIMING OIL CONTROL VALVE SOLENOID – Remove & Replace – V6 Bank 1,Right,One,Intake or Exhaust – [NOTE: Labor estimates listed are for R&R only and DOES NOT include diagnosis time.]
Karen C. gave our service a 5 star review on 3/24/2021